Installing Engineered Hardwood Floor

by admin on January 15, 2009

Time-lapse video οf installation οf engineered hardwood floor

No related posts.

Related posts brought to you by Yet Another Related Posts Plugin.

{ 9 comments… read them below or add one }

rgentltd January 15, 2009 at 7:41 am

very enjoyable. the end sums it all up!

216985 January 15, 2009 at 7:41 am

three weeks thats way too long

lmstrutt January 15, 2009 at 7:41 am

Despite how the video looks, we actually took our time and did not hurry. It probably took us about 30 hours over a three-week period.

OPT1MUS124 January 15, 2009 at 7:41 am

That was awesome. How long did it take you guys to do that?

sheik718 January 15, 2009 at 7:41 am

Thanks

lmstrutt January 15, 2009 at 7:41 am

From what I’ve read, the moisture barrier is put down first.

sheik718 January 15, 2009 at 7:41 am

One more question. Let’s say i have a two layer underlayment. One layer is a plastic moisture barrier and the other layer is a foam pad, which one goes on bottom and which on top?

lmstrutt January 15, 2009 at 7:41 am

Standard foam underlayment, a thin, foam padding measuring approximately 1/8″ thick, on top of the existing lanoleum tile floor.

sheik718 January 15, 2009 at 7:41 am

What kind of underlayment did you sue?

Leave a Comment

Previous post:

Next post: